Clearing Path & Initial Berm Formation
At 5:50 in
Cutting in a Driveway and Building a Privacy berm #1
What happens here
The first physical task involves using a Kubota SVL 75-2 skid steer to begin clearing the designated path for the new driveway and constructing the privacy berm. The operator systematically pushes organic debris, logs, and soil into the outlined area, forming the initial structure of the berm. The goal is to establish the berm's foundation by encapsulating these materials within the native sandy soil, which will eventually degrade and create a more cohesive and stable base. This process is crucial for stabilizing the shifting sandy soil characteristic of the property and for setting up the privacy barrier before the main driveway construction continues.
Goal: Using a skid steer, the project begins by clearing vegetation and forming the base of a privacy berm, strategically incorporating logs and organic material into the sandy soil for stabilization.
Tools and materials
- Kubota SVL 75-2 Skid Steer
- Native Organic Materials
- Native Sandy Soil
What they say
(1,192 characters)Hide
What they say
(1,192 characters)Auto-generated from the video audio.