What happens here

The presenter receives a phone call regarding a supply chain problem: the required 'mega long' roofing rafters (30 ft) are missing, with only shorter 16-ft rafters delivered. This causes a delay and necessitates further planning. Meanwhile, the flatbed truck driver skillfully backs the trailer, now primarily carrying the 60-foot beam, down a sloped dirt path, guiding the extremely long load to a designated position. This successful maneuver achieves 'Miracle number one' – clearing the path and setting up the beam for the next stage of lifting.

Goal: A critical supply chain issue with missing long roofing rafters arises, while the 60-foot beam is successfully re-positioned by the truck for crane access, completing the first 'miracle'.

Tools and materials

  • 60-foot Wooden Beam
  • Flatbed Truck
  • Wooden Blocks

What they say

Hide

well the uh I'm assuming the 16f Footers are for those uh bump out sections for the dining and kitchen but the long ones that go from the beam all the way down to the footings we're missing more supplies the roofing Rafters are 16f Footers we need the mega long ones which I think they're like 30 feet I'm not sure we're about to find out but they're not here which sucks 8 and 3/4 36 in deep 60 ft long Miracle number one is done on to Miracle number two my goal is going going to be using my Fork Clift to throw it up here