Install Vapor Barrier and Prepare Footings
At 5:33 in
Cool Trucks and Crazy Concrete Guys 4K
What happens here
After the sub-base is finely graded, a large sheet of polyethylene (poly) plastic is carefully unrolled and laid over the entire area of the future concrete slab. This poly acts as a vapor barrier, preventing moisture from rising from the ground into the concrete. The creator explains that laying this vapor barrier is a required step according to engineering drawings, even though he personally questions its necessity in some contexts. The concrete crew also prepares the 'bell footings' and 'column footings' (which are not visible under the poly at this stage but are thickened areas designed to support the structure's weight).
Goal: Lay down the vapor barrier and ensure footings are ready for concrete
Tools and materials
- Skid Steer Loader Kubota — Accessing the site and moving materials
- Polyethylene Sheeting — Acting as a vapor barrier to prevent moisture intrusion into the concrete
What they say
(1,527 characters)Hide
What they say
(1,527 characters)Auto-generated from the video audio.