Concrete Pouring and Initial Spreading

9:02
13:41
22.6K views

At 9:02 in

Cool Trucks and Crazy Concrete Guys 4K

What happens here

With the concrete now being delivered by the conveyor truck, a team of workers quickly gets to work. They use shovels and rakes to spread the concrete evenly across the polyethylene vapor barrier, ensuring a consistent thickness. Several workers, wearing protective boots, move across the fresh concrete, using their tools to level and distribute the material. The pouring continues steadily, filling the formed slab area.

Goal: Evenly spread and distribute the freshly poured concrete

Tools and materials

  • Concrete Boots — Protecting feet from wet concrete
  • Rake — Leveling and distributing concrete
  • Shovel — Spreading large quantities of concrete
  • Concrete Bonki Custom Mix Concrete — The main structural material of the slab

What they say

Hide

that dumps into the second conveyor belt and then they just move that shoot around we put well we started at 700 a.m. Saturday morning and I I think we got well we we got two or three uh concrete truck loads in by heck we were done by 9:00 [Music] a.m. [Music] now what you can't see here because the of the poly is we have a bell footing so around the entire perimeter of the pad it's a 12in thick and slab fortified with rebar which we did pull that rebar up but then inside of the pad itself is another footing that's dug down and those are designed to support the columns which are going to eventually support the house so we have the Bell footing and then we have all these column footings which unfortunately are covered [Music] up

Auto-generated from the video audio.