The project begins with initial site preparation, which involves rough grading and leveling the area where the concrete slab will be poured. The area is outlined with wooden forms and workers use rakes and other hand tools to spread and roughly level the soil. This foundational work sets the stage for the precise sub-base grading that follows.

Goal: Prepare the rough terrain for the concrete slab foundation.

Tools and materials

  • Rakes — Spreading and leveling soil during rough grading
  • Wooden Forms — Outlining the perimeter of the concrete slab