Plywood Preparation for Formwork
0:52
29:00
9.5K views
At 0:52 in
CONCRETE COUNTERTOPS - Lessons Were Learned!
What happens here
The project begins with an overview of the plan to create a second countertop. The presenter outlines the dimensions for the concrete slab, which is approximately 19.5 to 20 inches wide by 78 inches long. He emphasizes using factory edges of the plywood to ensure straight cuts for the formwork. The plywood is cut slightly oversized to allow for a snap line, ensuring a perfectly straight edge for the subsequent formwork.
Goal: Cut the plywood base for the concrete countertop formwork with precise dimensions.
Tools and materials
- Circular Saw DeWalt — Cutting the plywood to size
- Plywood Sheet — Creating the base of the concrete formwork
- Safety Glasses — Eye protection during cutting
- Tape Measure — Measuring dimensions for the plywood cut
What they say
(795 characters)Hide
What they say
(795 characters)Auto-generated from the video audio.