Concrete Removal and Second Pour Preparation
17:30
29:00
9.5K views
At 17:30 in
CONCRETE COUNTERTOPS - Lessons Were Learned!
What happens here
Upon inspection the next day, the first concrete pour had failed to harden properly and was crumbly. The entire slab is broken up and removed from the formwork. For the second attempt, the concrete mix is adjusted: no flow control additive is used, and a rebar grid is again placed, ensuring proper elevation with spacers. The new concrete is then mixed and carefully poured into the formwork.
Goal: Remove failed concrete and prepare for a successful second pour.
Tools and materials
- Rebar — Reinforcing the second concrete pour
- Rebar Pieces — Breaking up and prying out the failed concrete
- Rebar Tie Tool — Securing rebar intersections
- Shovel — Mixing concrete ingredients and scooping
- Wheelbarrow Jackson — Mixing and transporting concrete
- Concrete Mix — The main material for the countertop slab
- Water — Mixing the concrete