Skip to main content

Remove Flagpole and Concrete Base

12:12
26:14
36.4K views

At 12:12 in

Competing against Lowball sh❌tty Contractors

What happens here

With the retaining wall removed, the excavator is positioned to lift the flagpole. The operator skillfully uses the hydraulic thumb and bucket attachment to grip the large concrete base of the flagpole. With precise movements, the excavator lifts the entire flagpole structure out of its foundation hole and gently lays it down horizontally on the paved parking lot. The crew members observe and ensure the safe execution of this task, making sure the pole is not bent or damaged during the process. The large concrete base and the metal pole now constitute a significant piece of segregated construction debris ready for removal from the site.

Goal: The excavator carefully lifts the entire flagpole, including its massive concrete base, and lays it down on the ground for later transport.

Tools and materials

  • Excavator with Hydraulic Thumb
  • Flagpole with Concrete Base

What they say

Hide

coming I don't know yeah I feel this wall moving every time you loosen that so that anchor is definitely holding this wall up hopefully the pole ain't moving backwards I haven't really looked at that can't say I've ever anchored a wall to something I know we've done where we've anchored garages garage walls to soil behind it cuz the wall was blowing in why don't why don't you get out of there Bruce I'll we'll push a little bit on the wall here and it'll it'll let go but then this whole Wall's probably going to fall this direction cuzz if if it's under that much tension it's not under a great deal of tension no but enough can you back that excavator up real quick case this wall CL which ex oh the you could actually see the wall moving as Bruce was loosening it up anyway that's not the worst case scenario I've ever seen I'd say one of the worst ret painting walls that I've ever seen I got bid I got beat out on a bid on a job in St Paul Minnesota it was just a residential project and I happened to be in the neighborhood and I was doing other work other development work and so I stopped by the project to see what the company was doing that beat me on this retaining wall Bid And what I found out so I bid the wall to put in versalock standard units 6 in of Base 12 plus in of drainage a get behind it pinning the blocks together putting a cap unit on gluing it in place and doing that whole riger roll Excavating demolition the whole nine yards what it came out and found out that the other contractor that beat me was doing was they were using a CMU unit concrete masonry unit they were dry stacking it so these are hollow blocks and they were just sticking one h no mortar just sticking one hollow block on top of the other but they had no drainage aggregate behind the wall and nothing below the wall they were just slapping it on pure dirt this was retaining wall that was meant to last at best that summer because the first free free St cycle that Frost heave is going to move those blocks and they're going to pop off and since there was nothing adhering one block to the next block that wall was

Auto-generated from the video audio.