Excavate Mulch & Expose Wall Foundation
At 1:45 in
Competing against Lowball sh❌tty Contractors
What happens here
Workers begin by manually removing significant layers (approximately 10 inches deep) of mulch and soil that cover the base of the flagpole and surround the retaining wall. During this excavation, paver bricks are discovered underneath the mulch around the flagpole's concrete base. This manual digging helps to understand the exact dimensions and construction details of the existing structures. Jimmy, one of the crew members, uses a tape measure to check the current height of the retaining wall, noting it's about a 4-foot wall, which is different from the planned 3-foot 10-inch height for the new wall. This step is crucial for uncovering the extent of the existing structures and any hidden elements.
Goal: The team manually excavates thick layers of mulch and soil around the flagpole base and retaining wall to expose their foundations.
Tools and materials
- Shovels
- Tape Measure
- Mulch
- Paver Bricks
What they say
(1,130 characters)Hide
What they say
(1,130 characters)Auto-generated from the video audio.