Lay and Level the First Course
3:25
20:52
498.5K views
At 3:25 in
Common Retaining wall mistakes & how to AVOID THEM, bad designs, bad base, wrong block....#2
What happens here
Lay the first course of interlocking blocks directly on the prepared and compacted base material. Use a Versa-Lifter tool to easily carry and position the blocks. Each block must be perfectly level both lengthwise and widthwise. Use a level and a dead blow hammer (or a piece of wood and a framing hammer) to gently tap the blocks into position and achieve the desired level. For optimal stability, the blocks should have a slight backward tilt (bubble leaning slightly towards the front face of the block) to compensate for geogrid layers and prevent the wall from leaning forward over time.
Tools and materials
- 2x4 Wood Scraps
- Dead Blow Hammer (8-pound)
- Framing Hammer
- Interlocking Retaining Wall Blocks
- Level
- Versa-Lifter Tool
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.