Skip to main content

Compact Raw Soil Base

1:51
20:52
498.5K views

At 1:51 in

Common Retaining wall mistakes & how to AVOID THEM, bad designs, bad base, wrong block....#2

What happens here

Once the excavation is complete, the raw soil at the bottom of the trench must be thoroughly compacted. Use a plate compactor (like a Wacker Neuson DPU 4045 H) to compact the soil in 8-12 inch lifts. If the trench is deeper than 12 inches, add soil in layers (lifts) and compact each layer individually to ensure proper density. This is a critical step to prevent future settling of the retaining wall.

What they say

Hide

Yep. All right. So, we are 4 ft in the air. We're 4 ft up on this retaining wall. We're talking about base because it all starts right here. A a piece of equipment like this is absolutely fundamental to making sure that your base is done the right way because no matter what you do when you go to dig out that bottom of that retaining wall when you hit that raw soil, you're going to loosen it up. So before you do anything else, before you put in your base material, before you do anything, you take that raw soil and you compact it. A packer like this will pack down approximately 8 to 12 in. So, if you happen to make a mistake and dig deeper in a spot than 8 to 12 in, then you'll have to compact in lifts. And a lift basically means that you put in 8 to 12 in of material, compact that, and then come up the rest of your height and pack it. If you put in 2 or 3 ft of soil all at once, this thing won't compact it. It'll pack the top, but it won't leave anything down below compacted and leave it soft. So, let's go actually over to

Auto-generated from the video audio.