Execute the Chimney Demolition
2:10
4:34
585.1K views
At 2:10 in
Caught on Tape!
What happens here
With the verbal waiver recorded and the chimney prepared, the crew proceeds with the demolition. An excavator (DAEWOO 75V) with a bucket is used. A chain is wrapped around the bucket, and the bucket is then positioned to pull the chimney down. The excavator carefully applies force, pulling the chimney straight down, demonstrating effective and controlled demolition.
Goal: Safely pull down the chimney using an excavator into a controlled fall zone.
Tools and materials
- Chain — Wrapped around the excavator bucket to secure a grip on the chimney
- Excavator bucket DAEWOO — Attached to the excavator, used to engage the chimney with a chain
- Excavator DAEWOO — Pulling down the chimney structure
- iPhone Apple — Recording the live demolition for documentation
What they say
(741 characters)Hide
What they say
(741 characters)Auto-generated from the video audio.