What happens here

The installer meticulously applies blue painter's tape to the deck surface, creating a guide line for the precise placement of the first large countertop side panel. With the assistance of a second person, the heavy engineered stone slab is carefully lifted and positioned against the wooden frame of the outdoor kitchen/bar, aligning its bottom edge with the tape line.

Goal: Establish precise alignment and position the first side panel

Tools and materials

  • Blue painter's tape — Creating precise guide lines on the deck surface
  • Large engineered stone slab — The first large side panel for the outdoor countertop
  • Wooden frame — The pre-existing structural support for the outdoor kitchen/bar