Layout and Initial Slab Placement
0:00
0:58
8.9K views
At 0:00 in
Called in the big guns @downtoearthstone.llc for this waterfall kitchen island!! Looking sleek!!
What happens here
The installer meticulously applies blue painter's tape to the deck surface, creating a guide line for the precise placement of the first large countertop side panel. With the assistance of a second person, the heavy engineered stone slab is carefully lifted and positioned against the wooden frame of the outdoor kitchen/bar, aligning its bottom edge with the tape line.
Goal: Establish precise alignment and position the first side panel
Tools and materials
- Blue painter's tape — Creating precise guide lines on the deck surface
- Large engineered stone slab — The first large side panel for the outdoor countertop
- Wooden frame — The pre-existing structural support for the outdoor kitchen/bar