Install Vertical Supports and Top Frame
0:47
3:44
29.9K views
At 0:47 in
Cabinet Spray Booth in 12 Minutes. Garage Paint Booth.
What happens here
Once the base frame is complete, insert the white vertical support poles into the corner connectors. Then, take another set of orange frame pieces and connect them to the top ends of these vertical poles using additional white corner connectors. This creates the upper frame of the booth, completing the rigid structural shell.
Goal: Erect the vertical structure and complete the top frame
Tools and materials
- Orange Frame Pieces The PaintLine — Forming the horizontal sections of the top frame
- White Corner Connectors The PaintLine — Connecting the top frame pieces to each other and to the vertical poles