Construct and Attach Second Tier Frame
2:28
28:31
140K views
At 2:28 in
Building an Outdoor Fire Table Using Plaster
What happens here
Once the initial base frame is complete and tested for structural integrity (by standing on it), the creator proceeds to build the second tier. This tier is designed to create a 5-inch overhang on all sides of the lower section. He repeats the process of measuring, cutting, and screwing together C-channel and J-channel metal components to create a second, larger rectangular frame. This second frame is then positioned on top of the first tier, creating the desired two-level structure for the fire pit table. Internal bracing is added to support the top surface where the burner will eventually sit.
Tools and materials
- Angle Grinder
- C-Channel Metal Tracks
- Cordless Drill
- J-Channel Metal Studs
- Safety Glasses
- Self-Tapping Sheet Metal Screws
- Tape Measure
- Work Gloves
What they say
(899 characters)Hide
What they say
(899 characters)Auto-generated from the video audio.