The narrator highlights a change order where the customer requested an additional two feet of height be added to the previously built 9-foot retaining wall. This request was accommodated without issue because the initial wall was 'overbuilt' with extra geogrid. This 'overbuilding' involves installing longer and more frequent layers of geogrid reinforcement than strictly necessary for the original design height. The philosophy is that while it adds a small amount to the initial cost, it provides crucial flexibility for future changes. If a wall is not designed from the 'ground up' to accommodate the ultimate desired height and any potential 'surcharge' (additional load on top), attempting to increase its height later can lead to 'technical engineering failure' or require a complete, costly tear-down and rebuild. By integrating this proactive overbuilding into the initial design and construction, the wall gains the inherent capacity to be safely extended or support heavier loads in the future, providing value and adaptability to the client.

Goal: This crucial step explains the strategic decision to 'overbuild' the retaining wall by installing longer and more extensive geogrid layers than initially required. This proactive engineering ensures the wall can accommodate future height adjustments or increased loads without needing to be torn down and rebuilt.

Tools and materials

  • Geogrid

What they say

Hide

[Music] so this project that we're working on had a lot of change orders and one of those change orders was the customer actually wanted an additional two feet added on top of the retaining wall that we had built and here's one of those big red flags if the wall isn't designed to have the extra footage added onto it you can't do it without putting the wall into a state of technical engineering failure meaning that the walls not built to handle the extra weight the extra load the reason we were able to add the extra two feet down without any issue is because when we build these walls we always add a little bit of extra geo grid on we always over build them so when the customer came to us with the request to make it taller we went to our engineer showed him how we had built it and he said go for it right good morning guys so here's the plan these boys are gonna work on the next round of step ups over on the corner there we got landon out here today so alex got hurt himself his pack up uh i think it was end of last week maybe and now alex that kid's a tank but oh boy you could tell he was hurting well with alex he is not the type of person to not not be able to be working if that makes sense you know so he's out trying to shovel gravel shovel dirt stack blocks with a super bunk arm poor joey he's running back and forth all day yesterday between blaine because blaine hurt his shoulder a couple weeks a couple weeks ago out on this side it's just a nasty sight to be getting around on so he's running in between the two snatching blocks out of alex's hand and snatching shovels out of blaine's hands and stuff like that all the while i'm desperately trying to stay ahead of them on this corner yeah we got landon out here today uh but i'm gonna keep working on the corner over here while them boys are doing their thing over there on the step-ups i don't know if you guys have actually met him or not but this is landon [Music] and landon's back in college but if you guys have been keeping track of following along with our videos and you saw the one where alice got kicked off the job this was the day alex got kicked off and he came out and did the pool demo with me so kind of shows you how long this project took this project took us a few weeks to complete and basically what it involved is an 11 foot retaining wall we brought in 45 dump truck loads or more of dirt and then on top of that retaining wall we also built a patio and we're going to show you the entire project…

Auto-generated from the video audio.