Install Blocks & Geogrid Reinforcement on Slope
At 0:05 in
Building a TALL engineered retaining wall on a steep slope #2
What happens here
Carefully lay each course of retaining wall blocks, starting from the lowest point of the wall and working upwards. Ensure each block is level and aligned with the previous course. After completing a few courses, roll out the geogrid reinforcement across the backfill behind the blocks. The geogrid should extend horizontally into the slope, anchoring the wall into the earth. Cut the geogrid to size, making sure there is sufficient overlap and coverage. Backfill the area behind the blocks and over the geogrid with crushed stone or gravel, then compact thoroughly. Repeat this process, layering blocks and geogrid, for the entire height and length of the wall.
Goal: Place retaining wall blocks in layers, ensuring proper level and alignment, and integrate geogrid reinforcement at specified intervals to increase the wall's structural stability on a sloped terrain.
Tools and materials
- Compactor (Wacker Neuson brand shown)
- Geogrid Reinforcement
- Level
- Mini Excavator (Bobcat brand shown)
- Retaining Wall Blocks
- Shovels and Rakes
- Skid Steer Loader (ASV brand shown)
- Crushed Stone/Gravel
- Dirt/Soil
What they say
(480 characters)Hide
What they say
(480 characters)Auto-generated from the video audio.