What happens here
After all plumbing rough-in is complete, patch up any removed subflooring sections. Reinforce the patched subflooring by adding an extra sheet of OSB (Oriented Strand Board) for increased stability and support, especially under the new shower area. This is also the stage where any wall relocations should be performed to achieve the desired shower size. In this case, a wall was moved two feet to make the shower 7 feet long.
Goal: Create a stable and appropriately sized footprint for the new shower.
Tools and materials
- Hammer — General framing work
- Impact Driver Dewalt — Driving screws for subflooring and framing
- OSB — Reinforcing the subflooring in the shower area
- Pry Bar — Removing existing framing if a wall is being relocated
- Saw — Cutting lumber for new framing
- Screws — Securing OSB to the subfloor and framing