Initial Excavation for Wall Footing
1:15
18:39
79.2K views
At 1:15 in
Building a flagstone wall and prepping for pavers day1
What happens here
Using a mini excavator (Bobcat 325) and hand tools such as a shovel and rake, a trench is dug along the side of the house where the new flagstone retaining wall will be constructed. Extreme care is taken during this excavation to avoid disturbing the hyper-compacted sub-material from the old driveway, as maintaining its stability is crucial for the foundation of the future paver parking pad. The depth of the trench is determined by the required elevation for the retaining wall, which ties into the final paver height.
Goal: Prepare the trench for the flagstone wall base without over-digging or disturbing sub-soil.
Tools and materials
- Mini Excavator Bobcat — Digging the trench for the retaining wall
- Rake — Smoothing the excavated soil
- Shovel — Fine-tuning the trench depth and edges
What they say