Import & Spread New Class 5 Base
At 13:40 in
Building a flagstone wall and prepping for pavers day1
What happens here
After the excavation is complete, a new load of Class 5 limestone base material is delivered by a Sure-Trac dump trailer. This material, which consists of 3/4-inch rock mixed with fines, is known for its excellent compaction properties, similar to the recycled Class 5 but made of fresh limestone. The skid steer is used to spread the Class 5 material over the prepared sub-base of the parking pad. Workers use rakes and shovels to evenly distribute the material, ensuring it's approximately 3 inches below the final intended height of the pavers (as measured by the string line).
Goal: Install a new, compactable Class 5 limestone base for the paver parking pad.
Tools and materials
- Dump Trailer Sure-Trac — Transporting and delivering Class 5 base material
- Measuring Tape — Verifying base material depth
- Rake — Evenly distributing the Class 5 material
- Shovel — Fine adjustments and moving material
- Skid Steer CAT — Spreading the Class 5 material
- String Line — Maintaining correct elevation
- Class 5 Limestone Base Material — Creating the compactable base for the paver parking pad