Installing Flagstone Pathway and Landing
8:41
22:06
61.8K views
At 8:41 in
Building a Boulder wall Start to finish
What happens here
After preparing the base, geo-textile fabric (road fabric) is laid over the compacted Class 5 aggregate. This fabric acts as a separation layer, preventing the aggregate from intermixing with the underlying soil and maintaining the integrity of the base. Irregularly shaped flagstone pieces are then carefully placed on top of the fabric and bedding material to form the walking surface of the pathway and landing. Each piece is leveled and adjusted with a rubber mallet, and a hand tamper is used to set them firmly.
Goal: Create a durable and aesthetically pleasing flagstone pathway and landing.
Tools and materials
- Broom — Sweeping bedding material into flagstone joints
- Hand Tamper — Compacting flagstone pieces into the bedding material
- Level — Ensuring flagstone pieces are level
- Rubber Mallet — Tapping flagstone pieces into place and adjusting their level
- Bedding Gravel/Sand — Creating a level bed for flagstone and filling joints
- Geo-textile Fabric — Separating base layers and preventing intermixing
- Irregular Flagstone Pieces — Creating the walking surface of the pathway
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.