Excavation and First Layer Boulder Placement
0:54
22:06
61.8K views
At 0:54 in
Building a Boulder wall Start to finish
What happens here
Large boulders are delivered to the site, and a mini-excavator equipped with a hydraulic grapple attachment (CMP Attachments, Hydracraple) is used to carefully excavate the trench and place the first layer of boulders for the retaining wall. A vibratory plate compactor (Wacker Neuson) is used to compact the soil base before each boulder is set, ensuring a stable foundation. This process is shown in time-lapse, emphasizing the careful and repetitive nature of boulder placement.
Goal: Establish a stable base and lay the first course of boulders for the retaining wall.
Tools and materials
- Level — Ensuring boulders are placed evenly
- Mini-Excavator Daewoo — Excavating trenches and lifting/placing large boulders
- Pry Bar — Making small adjustments to boulder placement
- Vibratory Plate Compactor Wacker Neuson — Compacting the soil base for stability
- Boulders — Constructing the retaining wall
- Soil — Backfilling and grading