Excavation and First Layer Boulder Placement

0:54
22:06
61.8K views

At 0:54 in

Building a Boulder wall Start to finish

What happens here

Large boulders are delivered to the site, and a mini-excavator equipped with a hydraulic grapple attachment (CMP Attachments, Hydracraple) is used to carefully excavate the trench and place the first layer of boulders for the retaining wall. A vibratory plate compactor (Wacker Neuson) is used to compact the soil base before each boulder is set, ensuring a stable foundation. This process is shown in time-lapse, emphasizing the careful and repetitive nature of boulder placement.

Goal: Establish a stable base and lay the first course of boulders for the retaining wall.

Tools and materials

  • Level — Ensuring boulders are placed evenly
  • Mini-Excavator Daewoo — Excavating trenches and lifting/placing large boulders
  • Pry Bar — Making small adjustments to boulder placement
  • Vibratory Plate Compactor Wacker Neuson — Compacting the soil base for stability
  • Boulders — Constructing the retaining wall
  • Soil — Backfilling and grading

What they say

Hide

phase two of the project all right guys we're gonna go a little bit behind the scenes and what i mean is i'm gonna actually watch this video for the first time with you i've actually this is let me just explain okay this is cool okay so the music you guys want machine sounds i get it i get it i get it but tim filmed this and unfortunately most of what tim filmed is time lapse there's no sound to time lapse so i either gotta add sound or [Music] talk and this is really kind of just fascinating to watch [Music] alex is laughing at tim [Music] oh tim gets frustrated but he's the most patient of all of us oh my god he's so much more patient