Backfilling, Grading, and Finishing Landscape Beds
16:40
22:06
61.8K views
At 16:40 in
Building a Boulder wall Start to finish
What happens here
The area behind the retaining wall is backfilled with a layer of geo-textile fabric, followed by Class 5 aggregate (gravel) and then a layer of topsoil. A skid steer is used to efficiently move and spread the materials. Workers hand-rake the topsoil to achieve a smooth, even surface ready for seeding or sod. This completes the drainage and planting areas around the newly constructed wall and path.
Goal: Create functional drainage and planting beds around the new hardscaping.
Tools and materials
- Rake — Fine-grading topsoil
- Shovel — Detail work and manual spreading
- Skid Steer Caterpillar — Spreading aggregate and topsoil
- Class 5 Aggregate — Drainage layer behind the wall and around the house
- Geo-textile Fabric — Drainage and separation layer
- Topsoil — Final layer for planting and aesthetics