Manual Deconstruction and Initial Clearing
2:37
30:16
41.2K views
At 2:37 in
Building a Big Block Retaining wall 4K
What happens here
Upon the arrival of the heavy machinery, the crew begins the preliminary groundwork. This involves manually removing existing loose rock wall blocks and any immediate obstacles from the foundation area. Shovels are used to clear debris, and the skid steer is utilized to transport the removed materials to a temporary pile on the side. This initial clearing creates space for the mini-excavator to begin more extensive digging.
Goal: Clear the immediate work area of existing structures and debris.
Tools and materials
- Shovel — Manually digging and clearing debris
- Skid Steer ASV RT-75 Posi-Track — Moving removed rock blocks and dirt
- Work Gloves — Protecting hands during manual labor
- Old Rock Wall Blocks — Debris to be removed
What they say