Position First Section on Concrete Pad and Prepare for Second
10:27
13:01
12.4K views
At 10:27 in
Better than a BOXABL BUT MOVING this HOUSE is
What happens here
Upon reaching the designated concrete pad, the first section of the modular home is meticulously positioned. The transport driver disconnects the 'oversize load' banner and prepares to unhook the house section. The presenter learns from the driver that he will now return to pick up the second half of the house, indicating that the final assembly will occur once both sections are on site. The concrete pad has pre-installed pipes and connections for utilities.
Goal: Accurately place the first modular home section on the foundation and prepare for the arrival of the second section.
Tools and materials
- Concrete Pad
- Drill/Impact Driver
- Modular Home Section
- Transport Truck