Skip to main content

Driveway Modifications and Challenges

9:24
13:01
12.4K views

At 9:24 in

Better than a BOXABL BUT MOVING this HOUSE is

What happens here

The homeowner walks up his steep, unpaved driveway, explaining that it previously had a severe dip. He purchased and added 30 truckloads of clay, costing $5,500, to create a pure clay center for stability. He also contoured and terraformed the sides, but notes that county restrictions prevented him from moving as much soil as he desired. He highlights the ongoing effort required to maintain and improve the driveway for such demanding transport tasks.

Goal: The homeowner details the extensive modifications he made to his steep driveway to make it suitable for heavy loads, explaining the challenges posed by the county's restrictions and the cost involved.

Tools and materials

  • Clay

What they say

Hide

woods do a little equipment therapy that means hop in my skid loader and just start shaving and Grading and Contour ring and what I did so this driveway came down and then it went down and then it went back up at the road so it had it looked like that does that make sense I can't yeah that's how it looked just trust me it sucked and this is not my ideal driveway by any means if I lived in my ideal world I would have taken that driveway across that way just to give it a little bit more privacy instead of a straight up and down run but the county came in and wouldn't let me move as much soil as I wanted to move they put a stop to it so then what I had to do was B I bought 30 some truckloads of clay $5,500 of clay so I got a Clay Center so the heart of this driveway is pure clay like a square and then I contoured and terraformed the side uh with the amount of material that the county would let me move so they allowed me to take out some of that Hill there alongside of the garage and all of that went to the sides of the driveway and we can talk about how you bid that here in a moment but right now I got more going on than wanting to talk about that morning Frankie morning the set crew should be here pretty quick I just cut these at 3 in up or what uh enough to get a coupling on as Clos huh yeah we got to have enough to get couplings on for sure I mean we can't cut them too low i' rather cut them a little too high have them a little too high than a little too low cuz some of the might not even have to cut because when he swings in here might be even out of the way who knows

Auto-generated from the video audio.