Position the Pavement Edging
0:04
0:20
1.4K views
At 0:04 in
be chic. @PaverToolInnovators #hardscape
What happens here
The video shows the black, rigid pavement edging already in place alongside the paved surface. This step involves carefully unrolling or placing the edging material along the prepared and marked path. Ensure that the edging is positioned snugly against the existing pavement, following any curves or straight lines as planned. If using sections of edging, connect them according to the manufacturer's recommendations.
Goal: Lay out the edging material along the desired path
Tools and materials
- Pavement Edging — The primary barrier material to prevent lateral creep
- Rubber Mallet — Gently tapping the edging into final position