Final Inspection and Cleanup
0:18
0:20
1.4K views
At 0:18 in
be chic. @PaverToolInnovators #hardscape
What happens here
After all the stakes have been driven, perform a final visual inspection of the entire length of the installed pavement edging. Check that it is straight, consistently level with the paved surface, and firmly secured without any visible gaps or wobbles. If necessary, use a rubber mallet to gently tap down any slightly raised stakes or to adjust the edging's alignment. Finally, clear away any leftover gravel, soil, or debris from the work area to leave a clean, finished appearance.
Goal: Ensure the edging is properly installed and clean the work area
Tools and materials
- Broom — Sweeping away debris
- Rubber Mallet — Making minor adjustments to the edging or stakes