Site Excavation and Grading
0:00
0:55
35.6K views
At 0:00 in
Backyard pavers #diy
What happens here
Begin by unloading the Ditch Witch Mini Skid Steer from its trailer. Once the machinery is on site, use the mini skid steer's bucket attachment to excavate the designated area for the paver patio. Remove existing soil and debris, grading the area to the desired depth and ensuring a slight slope away from any structures for proper drainage. This creates the foundational trench for the paver base.
Goal: Prepare the ground for paver installation by excavating and grading
Tools and materials
- Ditch Witch Mini Skid Steer Ditch Witch — Excavating soil and moving materials
- Trailer — Transporting the mini skid steer to the job site