Install and Test Sliding Panels
At 0:33 in
Accent wall with Modern Mill ACRE
What happens here
Once the individual panels are fully assembled, carefully lift each panel and position it into the pre-installed top and bottom track system. The video shows the worker lifting a complete panel and then standing it upright, demonstrating how it would be placed. Guide the top and bottom edges of the panel into their respective tracks, ensuring it sits properly within the frame and can move freely. Test the sliding mechanism by gently pushing and pulling the panels across the track. Verify that they slide smoothly, without catching or binding. Minor adjustments to the tracks or panel fit may be needed if there are any issues. The completed screen should provide a dynamic visual effect as the panels slide, allowing for adjustable privacy and light control.
Goal: Integrate the assembled panels into a functional sliding privacy screen system and ensure smooth operation.
Tools and materials
- Assembled Privacy Screen Panels N/A — The completed sections of the privacy screen ready for integration into the sliding system
- Bottom Sliding Track — The lower guide rail that stabilizes and allows the panels to slide (implied from the final product's functionality)
- Level
- Shims
- Top Sliding Track — The upper guide rail that supports and allows the panels to slide (implied from the final product's functionality)