Lay Pavers and Apply Polymeric Sand
5:43
11:40
63.5K views
At 5:43 in
A Patio Failure I've Never seen.
What happens here
The cleaned existing pavers are then carefully laid onto the newly prepared, level permeable base. They are placed tightly together, ensuring proper alignment and a consistent joint pattern. After all pavers are laid, polymeric sand is swept into the joints. This specialized sand hardens when moistened, locking the pavers in place, preventing weed growth, and further enhancing the structural integrity and durability of the patio. The sand is then watered according to manufacturer instructions to activate its binding properties.
Goal: Place the pavers onto the prepared base and fill the joints with polymeric sand, then water to set.
Tools and materials
- Hose with Spray Nozzle
- Plate Compactor (with rubber mat)
- Push Broom
- Rubber Mallet
- Polymeric Sand Platinum 10
What they say
(1,247 characters)Hide
What they say
(1,247 characters)Auto-generated from the video audio.