What happens here

For the adjacent walkway area, the same process of paver removal, deep excavation, installation of geotextile fabric, drain tile, 3/4 clear aggregate base, permeable paver base grid, and relaying of pavers is followed. This ensures a consistent and effective drainage solution across all interconnected paver surfaces. Additionally, in the lawn adjacent to the newly reconstructed paver areas, an outspout system is installed. This involves digging a trench, laying drain tile from the patio's base drainage system to the outspout, and burying the outspout cover in the lawn. This final step ensures all collected water is safely discharged away from the foundation and paved areas.

Goal: Reconstruct additional paver areas using the same permeable base system and install new outspouts in the lawn for final water discharge.

Tools and materials

  • Level (long)
  • Plate Compactor
  • Rake
  • Shovels
  • Wheelbarrow
  • Drainage Outspout
  • Perforated Drain Tile
  • Snap Edging
  • Soil/Topsoil

What they say

Hide

[Music] so in this case even though class 5 is permeable because it actually is you can use class 5 in certain situations as drainage material it can also still trap water that's the problem it's not a true free-flowing drainage material although it makes a great base if you get into situations where you know you're going to be encountering water you have to take different steps now whoever built this originally probably wasn't anticipating water it's not really a likely spot to have water so we can't blame them for what they okay so as you can see alex was a little busy in my absence and so once he has gotten the snap edging in got all the tiles laid back out what sand basin pack excreted all that now we just need to put a special kind of grout in so that way they don't move so much a little few little details and it'll be all wrapped up [Music] so [Music] all right so here's the final wrap up we got the patio done and and put a drain spout in right there put down fabric all the whole nine yards i just rebuilt it back up up put the gator pads in put sand on and laid all the tiles in and grouted them and we ripped out all this rebuilt it back up how it should have been built up in the first place grouted it it got all that all wrapped up put the drain tile in with an outspout over here yeah the customer is happy with what we've done it's 10 times better than what it was when we first rolled up and now we're moving to the backyard here to give them a boulder wall to probably give them more of a backyard you can clearly see alex is already hard at work okay putting another putting more boulders in