Create Access Ramp and Sort Debris
At 3:16 in
A homeowners Nightmare
What happens here
Once the pool structure is mostly dismantled, a ramp is created using existing soil to allow the CTL access into the deep end. The demolition debris (such as metal and concrete pieces) that was removed from the pool perimeter is temporarily piled. The video emphasizes that only the vermiculite layer (a lightweight, porous material often used as a base under pool liners) can remain in the pool, provided it is punctured to allow water drainage. All other man-made materials and larger concrete pieces are hauled away, making them available for recycling.
Goal: Build a ramp for heavy equipment access into the pool, separating and removing all demolition debris except the punctured vermiculite layer.
Tools and materials
- Compact Track Loader (CTL)
- Vermiculite Layer
What they say
(2,501 characters)Hide
What they say
(2,501 characters)Auto-generated from the video audio.