Dig Post Holes
At 4:28 in
$50 Farm Fence at 1/4 cost of chainlink
What happens here
Begin the construction by accurately laying out the fence line to ensure a perfectly rectangular shape for the enclosure. Using an ASV RT-40 compact track loader (or a similar heavy-duty machine) equipped with an auger attachment, dig holes for each fence post. These holes should be spaced approximately 10 feet on center and dug to a depth of 3 feet below grade. Due to challenging soil conditions encountered (thick, heavy clay that clogs the auger and makes progress difficult, especially on sloped terrain), the ASV RT-40 is replaced by a CastLoaders machine. The CastLoaders machine, with its wheeled design (as opposed to tracks), proves more effective at navigating the muddy, mucky, and sloped ground, minimizing turf damage while efficiently digging the remaining post holes. Be prepared to adapt to different soil types and consider alternative machinery if necessary.
Goal: Dig evenly spaced and adequately deep holes for all fence posts.
Tools and materials
- ASV RT-40 Compact Track Loader ASV — Digging post holes, initially
- Auger Attachment Bobcat — Drilling the post holes
- CastLoaders Machine CastLoaders — Digging post holes, especially in challenging, wet, or sloped terrain
- Measuring Tape — Measuring the 10-foot spacing between post holes
- Soil Natural — The ground being dug, which presented challenges due to its clay composition and wetness
What they say
(2,252 characters)Hide
What they say
(2,252 characters)Auto-generated from the video audio.