Loading...
With the drain capped and the new angle stops in the closed position, you can now test for leaks. Go back to the main water shutoff valve and turn it on slowly to allow the pipes to fill gradually, which prevents water hammer. Return to the bathroom and carefully inspect all the new PEX connections and the threaded connections at the angle stops. Look and feel for any signs of moisture. For a more thorough test required by some codes, you can attach a pressure test gauge to one of the angle stops or an outdoor spigot and pressurize the system to check for any pressure drop over time.
This guide provides comprehensive, step-by-step instructions for roughing-in the drain and water supply lines for a new bathroom vanity. It covers planning the layout, running the drain-waste-vent (DWV) system, installing PEX supply lines, and setting the shutoff valves in preparation for drywall and final fixture installation.
This project is rated "intermediate" because it requires precise measurements, proper pipe joining techniques, and an understanding of plumbing codes. For a DIYer with some experience, expect 8-16 hours of work, depending on existing wall access and any unforeseen issues. Costs can range from $150-$300 for materials, assuming you already own basic tools.
Always shut off the main water supply before cutting into existing lines to prevent flooding. Wear appropriate personal protective equipment (PPE) like safety glasses, gloves, and hearing protection, especially when using power tools like drills and hole saws. Be mindful of electrical wires inside walls when drilling or cutting.
While copper and CPVC are alternatives, PEX is often preferred for DIY projects due to its flexibility, ease of installation (fewer fittings, no soldering), and resistance to freezing. However, PEX requires specific crimp or expansion tools. If you're comfortable with soldering, copper is a durable choice, and CPVC offers a rigid, solvent-weld option.
A common mistake is incorrect drain slope, leading to clogs – ensure a 1/4 inch per foot slope for DWV lines. Another error is misplacing supply stub-outs, making fixture installation difficult; always double-check vanity and sink specifications. Also, failing to properly prime and cement PVC joints can cause leaks.
Start your project
chat with your ai