Skip to main content

Attach Baseboard Trim — Install Baseboards and Trim

Beginner5 mins

Part of project

Hardwood Flooring Installation · Step 8 of 9

Helpful?

In this video

Install quarter-round molding (often called beading in the UK) along the perimeter of the hallway where the floor meets the baseboards. This trim piece covers the expansion gap left during flooring installation. Measure and cut the molding to fit precisely, ensuring mitered corners for a clean look. Use a pneumatic nail gun, such as the DeWalt model shown, to secure the molding to the baseboard, not into the floor, to allow for flooring expansion. Drive nails at an angle for a stronger hold.

79.4K views300

FAQs

What are the most critical steps for a beginner to get right during hardwood floor installation?

Subfloor preparation and plank acclimation are paramount for a successful hardwood floor. Ensure the subfloor is meticulously clean, level, and dry to prevent future issues. Acclimating the wood planks in the installation area for several days allows them to adjust to your home's specific humidity, which is essential for preventing warping, gapping, or buckling after installation.

What specialized tools are essential for hardwood flooring installation that I might not already own?

For a nail-down installation, a flooring nailer/stapler (like the Freeman PFL618C) is indispensable. You'll also need a chop saw or miter saw for precise cuts and potentially a jamb saw for undercutting door casings. A quality shop vacuum and industrial floor scraper are crucial for proper subfloor preparation, and a chalk line will help keep your rows straight.

How long should I expect the entire hardwood flooring project to take, especially for a beginner?

While the installation itself might be estimated at 5 days, the total project time for a beginner can be longer. Crucially, hardwood planks require 3-5 days (or as per manufacturer instructions) for acclimation before installation even begins. Extensive subfloor preparation, such as applying self-leveling underlayment, can also add significant time, potentially extending the project to over a week.

What are the main safety precautions to take when installing hardwood flooring?

Always wear appropriate personal protective equipment (PPE), including eye protection, hearing protection when using power tools or the flooring nailer, and work gloves. Ensure good ventilation, especially when working with adhesives like Henry 1171, and follow all product-specific safety guidelines. Keep your work area tidy to avoid tripping hazards from tools and materials.