Skip to main content

Install Baseboards — Install Baseboards and Trim

Beginner5 mins

Part of project

Hardwood Flooring Installation · Step 8 of 9

Helpful?

In this video

With the hardwood flooring fully installed, proceed to install the baseboards around the perimeter of the room. Measure each wall segment and cut the baseboard pieces to length, using a miter saw to create precise 45-degree angle cuts for inside and outside corners for a seamless joint. Place the baseboards against the wall, ensuring they cover the expansion gap left by the hardwood flooring. Secure the baseboards to the wall studs using a finish nailer and appropriate finish nails. Fill any nail holes with wood filler and caulk the top edge of the baseboards where they meet the wall for a clean, finished appearance (though these final finishing steps are not explicitly shown in the video).

3.5K views70

FAQs

What are the most critical steps for a beginner to get right during hardwood floor installation?

Subfloor preparation and plank acclimation are paramount for a successful hardwood floor. Ensure the subfloor is meticulously clean, level, and dry to prevent future issues. Acclimating the wood planks in the installation area for several days allows them to adjust to your home's specific humidity, which is essential for preventing warping, gapping, or buckling after installation.

What specialized tools are essential for hardwood flooring installation that I might not already own?

For a nail-down installation, a flooring nailer/stapler (like the Freeman PFL618C) is indispensable. You'll also need a chop saw or miter saw for precise cuts and potentially a jamb saw for undercutting door casings. A quality shop vacuum and industrial floor scraper are crucial for proper subfloor preparation, and a chalk line will help keep your rows straight.

How long should I expect the entire hardwood flooring project to take, especially for a beginner?

While the installation itself might be estimated at 5 days, the total project time for a beginner can be longer. Crucially, hardwood planks require 3-5 days (or as per manufacturer instructions) for acclimation before installation even begins. Extensive subfloor preparation, such as applying self-leveling underlayment, can also add significant time, potentially extending the project to over a week.

What are the main safety precautions to take when installing hardwood flooring?

Always wear appropriate personal protective equipment (PPE), including eye protection, hearing protection when using power tools or the flooring nailer, and work gloves. Ensure good ventilation, especially when working with adhesives like Henry 1171, and follow all product-specific safety guidelines. Keep your work area tidy to avoid tripping hazards from tools and materials.