Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 4 · Install New Treads and Landing Pad

Begin by dry-fitting each new tread and the landing pad to ensure a perfect fit. Make any necessary adjustments. Apply a generous bead of construction adhesive along the front and back edges of the stair stringer and subfloor where the tread will sit. Also, apply adhesive to the underside of the tread where it will contact the subfloor. Carefully place the tread onto the stringers, aligning it properly. Secure the tread by driving wood screws through the tread and into the subfloor and stringers below. Predrill pilot holes to prevent splitting, especially near the edges. For risers, if you are installing them, use construction adhesive and nails. Repeat this process for all treads and the landing pad, working from bottom to top.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install New Treads and Landing Pad

Begin by dry-fitting each new tread and the landing pad to ensure a perfect fit. Make any necessary adjustments. Apply a generous bead of construction adhesive along the front and back edges of the stair stringer and subfloor where the tread will sit. Also, apply adhesive to the underside of the tread where it will contact the subfloor. Carefully place the tread onto the stringers, aligning it properly. Secure the tread by driving wood screws through the tread and into the subfloor and stringers below. Predrill pilot holes to prevent splitting, especially near the edges. For risers, if you are installing them, use construction adhesive and nails. Repeat this process for all treads and the landing pad, working from bottom to top.

Videos for this step

Install Remaining Treads and RisersInstall New TreadsInstall First Tread and Riser

Tools and Materials

← Project

How to Install Treads and a Landing Pad on L-Shaped Stairs

Step 4 of 5·5 hr left

Remove Old Treads and Risers
120 minutes7 items
Prepare Stair Subfloor
90 minutes6 items
Measure and Cut New Treads and Landing Pad
150 minutes9 items
4
Install New Treads and Landing Pad
180 minutes9 items
5
Install Risers (if applicable) and Finishing Touches
120 minutes7 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.