Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 2 · Mark Bracket Positions

Hold the handrail itself or one of its mounting brackets against the wall at the pre-marked height on a stud. Use a level to ensure the bracket is perfectly horizontal. Mark the locations of the screw holes on the wall through the corresponding holes in the bracket. Repeat this process for all necessary bracket locations, ensuring consistent spacing and alignment with the studs. If installing a continuous handrail, ensure the brackets align with the handrail's pre-drilled holes or mounting points.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Mark Bracket Positions

Hold the handrail itself or one of its mounting brackets against the wall at the pre-marked height on a stud. Use a level to ensure the bracket is perfectly horizontal. Mark the locations of the screw holes on the wall through the corresponding holes in the bracket. Repeat this process for all necessary bracket locations, ensuring consistent spacing and alignment with the studs. If installing a continuous handrail, ensure the brackets align with the handrail's pre-drilled holes or mounting points.

Videos for this step

Install Handrail Brackets (Wood Studs)Secure First BracketSecure Handrail and Mark Final Cut

Tools and Materials

← Project

How to Install a Handrail on a Plaster Wall

Step 2 of 5·1.3 hr left

Locate Wall Studs
20 minutes4 items
2
Mark Bracket Positions
15 minutes4 items
3
Drill Pilot Holes
20 minutes3 items
4
Mount Handrail Brackets
25 minutes3 items
5
Attach Handrail to Brackets
20 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.