The vanity drain needs to connect to the home's main Drain-Waste-Vent (DWV) system. Using a drill with a 2-inch hole saw or auger bit, drill holes through the center of the studs leading from the vanity location to the main vertical drain stack. The holes must be pitched downwards towards the main stack at a rate of 1/4 inch per foot to ensure proper drainage. Use a level to verify the slope. Cut sections of 1.5-inch PVC pipe to run through the studs. You will need to cut into the main stack to install a new sanitary tee fitting that will accept the new vanity drain line. Dry fit all pieces first. Then, apply PVC primer to both the pipe end and the inside of the fitting, followed immediately by PVC cement, and firmly push the pipe into the fitting with a slight twist. Hold for 30 seconds.
Step 3/8
Run the Drain and Vent Line2 min