Carefully lower the newly prepared pump into the center of the pit. Ensure the pump is sitting flat on the bottom and that its float switch has ample room to move up and down without hitting the pit walls. Measure and cut the vertical PVC pipe to the correct length to fit between the new pump's adapter and the existing discharge line, accounting for the height of the new check valve. It's best to install a new check valve. A new valve typically includes two rubber couplings and four clamps. Slide the clamps and couplings onto the pipe ends. Insert the check valve, making sure the flow-direction arrow points UP, away from the pump. Position the valve and couplings, then firmly tighten all four band clamps with a screwdriver or nut driver.
Step 5/7
Install New Pump and Connect Piping2 min