Step 6 · Final Inspection and Water Test
Visually inspect the entire installation. Check that all shields are securely fastened and that there are no exposed sections of pipe, valves, or abrasive fittings. Gently tug on each shield to ensure it is secure. Slowly turn the angle stop valve handles counter-clockwise to restore the water supply. Turn on the hot water at the faucet and let it run for a minute. Using your flashlight, carefully inspect all connections at the valves and faucet for any signs of dripping or leaks. If everything is dry and secure, the installation is complete.
Tools and Materials
PrevNext