With all connections made, it's time to test your work. Place a dry paper towel under all new connections (supply lines, drain assembly, P-trap) to make it easy to spot small drips. Remove the aerator from the faucet spout to prevent any debris from clogging it. Slowly turn on the hot and cold water shutoff valves all the way. Check for any leaks at the valves and at the faucet connections. Turn on the faucet and let both hot and cold water run for a minute to flush the lines. While the water is running, check the faucet base and all drain connections for leaks. Fill the sink basin completely and then release the water to put a large volume through the new drain assembly, checking carefully for any leaks. If everything is dry, turn off the faucet and screw the aerator back on. The installation is complete.
Step 5/5
Final Checks and Testing2 min