Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 8 · Install Railings (Optional)

If your design includes railings, mark the locations for the railing posts on the stringers or treads. Typically, posts are attached to the outside of the stringers using lag bolts. Once the posts are securely in place, measure and cut the handrail material to span between posts or from a post to the end of the steps. Attach the handrail to the posts using appropriate fasteners, ensuring it is at a comfortable height (usually 34-38 inches above the tread surface).

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Install Railings (Optional)

If your design includes railings, mark the locations for the railing posts on the stringers or treads. Typically, posts are attached to the outside of the stringers using lag bolts. Once the posts are securely in place, measure and cut the handrail material to span between posts or from a post to the end of the steps. Attach the handrail to the posts using appropriate fasteners, ensuring it is at a comfortable height (usually 34-38 inches above the tread surface).

Videos for this step

Construct and Install Railing SystemAttach HandrailInstalling Post and Handrails

Tools and Materials

← Project

How to Build Portable Deck Steps

Step 8 of 9·5 hr left

Design the Deck Steps
120 minutes4 items
Select Materials for Steps
60 minutes5 items
Cut Stringers
180 minutes8 items
Cut Treads and Risers
90 minutes5 items
Assemble the Step Structure
150 minutes5 items
Attach Steps to Deck
60 minutes4 items
Create a Stable Base
45 minutes6 items
8
Install Railings (Optional)
120 minutes6 items
9
Sand and Finish
180 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.