Step 3 · Run Wiring from Switch to Light Fixture
Determine the most efficient path to run the new electrical cable from where the switch will be installed to the new ceiling box. Drill holes through studs or joists as needed to pass the cable. Ensure the cable is secured at regular intervals with cable staples as required by local electrical codes. Leave sufficient slack at both the switch and fixture locations for making connections.