Skip to main content

Test Loader Operation

20:08
21:40
122.7K views

At 20:08 in

You've NEVER SEEN an ATV LIKE THIS

What happens here

After all components are installed and hydraulic fluid is added, start the ATV and operate the control switch to test the loader's functionality. The system will make noise initially as air is purged from the hydraulic lines. The bucket should move up, down, and tilt as expected. The video concludes with the successful operation of the loader system.

Goal: Verify proper function of the installed loader system.

Tools and materials

  • Control Switch Wild Hare Manufacturing — Controlling the loader's movements
  • Honda Foreman 500 ATV Honda — Operating the installed loader system