Skip to main content

Secure Sheathing to Ridge for Support

0:20
0:33
5K views

At 0:20 in

You asked, we answer!!

What happens here

In addition to toenailing the sheathing into the rafters (made possible by the offset strapping), the sheathing is further secured where it meets the ridge of the roof. For plywood panels that extend up to the ridge, the video explains that these panels are also nailed, specifically toenail-nailed, into the side of the ridge board along its entire length. This provides an important additional structural connection for the roof deck, enhancing its rigidity and tie-down, particularly at the highest point of the roof structure. The presenter notes that, in this specific construction, the distance from the rafter to the ridge is only 12 inches, making this method of direct attachment into the ridge practical and highly effective across the full width of the plywood panel. A hammer is briefly shown, although a nail gun would typically be the primary tool for efficiently securing sheathing.

Goal: Plywood sheathing panels are additionally nailed into the side of the ridge board along their entire length for comprehensive roof deck security.

Tools and materials

  • Hammer
  • Nail Gun
  • Plywood Sheathing
  • Ridge Board

What they say

Hide

so that we can still nail the sheathing is just offset it the tiniest bit so we can still toenail our sheathing into that rafter. It's only 12 in to the ridge, so it's not a big deal. Then we can also toenail into the side of the ridge on the whole length of that plywood panel. So that's how we do it. That's what the plans call for. Take it or leave it. Peace.

Auto-generated from the video audio.