Secure Sheathing to Ridge for Support
At 0:20 in
You asked, we answer!!
What happens here
In addition to toenailing the sheathing into the rafters (made possible by the offset strapping), the sheathing is further secured where it meets the ridge of the roof. For plywood panels that extend up to the ridge, the video explains that these panels are also nailed, specifically toenail-nailed, into the side of the ridge board along its entire length. This provides an important additional structural connection for the roof deck, enhancing its rigidity and tie-down, particularly at the highest point of the roof structure. The presenter notes that, in this specific construction, the distance from the rafter to the ridge is only 12 inches, making this method of direct attachment into the ridge practical and highly effective across the full width of the plywood panel. A hammer is briefly shown, although a nail gun would typically be the primary tool for efficiently securing sheathing.
Goal: Plywood sheathing panels are additionally nailed into the side of the ridge board along their entire length for comprehensive roof deck security.
Tools and materials
- Hammer
- Nail Gun
- Plywood Sheathing
- Ridge Board
What they say
(362 characters)Hide
What they say
(362 characters)Auto-generated from the video audio.