Skip to main content

Set Up Movable Cross Fences (Polywire)

20:13
36:44
26.8K views

At 20:13 in

Yellowstone? Yeah Right! A Real Day On A North Carolina Ranch | Hard Work Without Fake Drama

What happens here

Drive the UTV along the desired fence line to unwind the polywire. As you drive, release the polywire from the geared reel, ensuring it lays out straight. Every 15 paces (approximately 30-45 feet), stop and install a steel step-in post by simply stepping it into the ground. Hook the polywire onto the top of each step-in post. Continue this process until the desired temporary fence line length is achieved.

Goal: Establish temporary polywire fence lines for paddocks

Tools and materials

  • Geared Reels with Polywire Strainrite — Unwinding and tensioning the temporary fence line
  • Steel Step-in Posts Strainrite — Supporting the polywire and defining the paddock boundaries
  • UTV Honda Pioneer 1000 — Driving along the fence line for efficient polywire deployment