Geogrid Layering and Efficiency
At 9:09 in
WHY Retaining wall Engineers ARE ALL WRONG!!
What happens here
The presenter explains the strategic placement of geogrid. They lay four courses of blocks before backfilling and compacting the geogrid layer. This method is used to optimize efficiency by reducing the number of times equipment needs to switch between tasks, particularly for commercial projects. He explains that the initially loose or 'higgeldy-piggeldy' appearance of the geogrid is normal, as it becomes tensioned and functional once backfilled. The process involves backfilling up to the geogrid, flipping it over the face of the wall, compacting the backfill up to the top of the block, and then laying the next course, effectively trapping the geogrid. He reiterates the critical importance of consulting a specialized civil engineer for engineered walls to determine precise geogrid lengths based on wall height, soil type, and any loads (surcharge) behind the wall.
Goal: Efficiently incorporate geogrid into the retaining wall for structural reinforcement.
Tools and materials
- Geogrid — Reinforcing the soil behind the wall for structural stability
- Gravel — Creating the backfill layers
- Plate Compactor — Compacting backfill over the geogrid layers
- Retaining Wall Blocks — The main structural components of the wall