Skip to main content

Final Shaping of the Compost Pile

19:15
32:54
73.8K views

At 19:15 in

Whats the limits on Ram's gasser?

What happens here

Zach uses the ASV skid steer to finalize the shaping of the large black dirt/compost pile, carefully moving and distributing the material to create a uniform and accessible mound. The creator expresses his satisfaction with the completed pile, emphasizing its rich mix of organic materials which he deems ideal for his upcoming yard projects. The pile is now fully formed and ready for future use, allowing for easy harvesting of dirt with shovels or larger buckets as needed.

Goal: Complete the formation of the large compost pile.

Tools and materials

  • ASV RT-75 Posi-Track Skid Steer ASV — Final shaping of the dirt pile
  • Bucket — Moving and spreading dirt
  • Shovel — For future harvesting of dirt from the pile
  • Black dirt — The final product of the project

What they say

Hide

look how much chain is dragging you're gonna want to pop like a can of biscuits i have a feeling yeah that's why i'm just putting the pins back in yeah hit the go button let's see if she goes don't stand between the truck and trailer please and thank you we don't want another alex all right look at her squat that truck is so squatted we're gonna see if she can dump it could barely get here this is the max load that this truck's ever hauled or able to haul hey stand up lee i don't like you bending down case you got to jump back i want you to be able to jump jump please and thank you safety first zach no plan b [Laughter] we overloaded the trailer let's do plan b i'm just gonna fork some of the dirt out you start raising up on it while i'm [Music] forking [Music] that's the last stage but we're overweight for that last stage damn it put it down okay all right that's good that's good i just need enough that i can crawl in there and get something to back off [Music] hmm one stage two stage it's gotta be a third stage to that hoist how come i can't remember if there's a third stage or not i don't know this trailer just lifts up here so we don't know the sure track has how many stages do you know i think three but that that thing's almost vertical [Music] all right i'm gonna pull forward see how much i can get to shake loose a little bit just a little bit [Music] ah okay we got that whole front load all right stay back here i'm gonna go forward and back up there's the third state i told you there was a zack's like no there's only two stages on this one the sure track just goes higher my no it doesn't it does one two three we were still overweight though and at the wrong angle so you can hook it up best part is you can unhook it look it there's a couple gate posts gate post one gate post two you think i could have just looked down the line and gone hey wait a minute that's awfully familiar why don't i just use the stupid [Music] gauge okay [Music] actually too bad that first load though oh god this truck was hurt but these little tiny baby loads like this which i laugh and i say with a note of sarcasm because literally that is still way bigger than anything you'd go down the road but luckily i'm not i'm just going across the street when these gates go she's gonna go it's never as dramatic as you want technically i should measure the area then determine the depth that i want the black dirt then do the calculation which is length time widths time depth divided by…

Auto-generated from the video audio.